J-Mar Contracting, Permatech and Jaxon Constructions achieved an outstanding result with the waterproofing requirements for the basement of this prestigious multi story building. Initial focus was the basement of the development.
Considerations for this project included: water table, construction schedule, type of construction, impact on other site activities and most importantly, product back-up, quality assurance, and warranty. The stand out for this application was the Cetco Voltex DS SWR membrane with Waterstop RX. These products are manufactured with bentonite, a natural clay that has long term waterproofing properties.
There were three main advantages of the product selection.
Firstly toughness and flexibility of the membrane, which is puncture resistant with capacity to self heal and is easily repaired in the event of damage from on-site activities.
The Cetco membrane also has the ability to swell and prevent moisture transfer.
Finally, the ease of application meant that there was no welding of joints or adhesives required. The product is simply laid on the blinding slab and the joints overlapped before the steel fixers start placing the steel.
The same membrane was placed over the entire basement floor, turned up the piled and in-situ concrete wall sections and attached with impact fasteners. All joints were treated with the Waterstop RX. Shotcrete was applied directly to the membrane fixed to the pile walls.
J-Mar Contracting, an approved Cetco Applicator, were contracted by Jaxon Constructions to complete these works. Jason and his team from J-Mar worked diligently to ensure that all Cetco requirements were met or exceeded, they worked in complete collaboration with both the Jaxon team and subcontractor Advanced Formwork to ensure correct product application whilst being mindful of the requirements of other trades and the builder.
Basement works have now been completed and the de watering turned off, the result confirms correct product selection as well as utilizing suitably qualified quality contractors.
Considerations for this project included: water table, construction schedule, type of construction, impact on other site activities and most importantly, product back-up, quality assurance, and warranty. The stand out for this application was the Cetco Voltex DS SWR membrane with Waterstop RX. These products are manufactured with bentonite, a natural clay that has long term waterproofing properties.
There were three main advantages of the product selection.
Firstly toughness and flexibility of the membrane, which is puncture resistant with capacity to self heal and is easily repaired in the event of damage from on-site activities.
The Cetco membrane also has the ability to swell and prevent moisture transfer.
Finally, the ease of application meant that there was no welding of joints or adhesives required. The product is simply laid on the blinding slab and the joints overlapped before the steel fixers start placing the steel.
The same membrane was placed over the entire basement floor, turned up the piled and in-situ concrete wall sections and attached with impact fasteners. All joints were treated with the Waterstop RX. Shotcrete was applied directly to the membrane fixed to the pile walls.
J-Mar Contracting, an approved Cetco Applicator, were contracted by Jaxon Constructions to complete these works. Jason and his team from J-Mar worked diligently to ensure that all Cetco requirements were met or exceeded, they worked in complete collaboration with both the Jaxon team and subcontractor Advanced Formwork to ensure correct product application whilst being mindful of the requirements of other trades and the builder.
Basement works have now been completed and the de watering turned off, the result confirms correct product selection as well as utilizing suitably qualified quality contractors.
Pinnacle apartments roof top
Polyglass TPO to roof under ballast. Having invested in the necessary TPO welding equipment allows us to complete TPO installation from start to finish and not outsource the welding like some of our competitors. Approximately 800m2 installed ahead of schedule in 5 days.